SCOPE OF PROJECT
Eco Tech Electrical was engaged by BT Energy to carry out solar panel system installation at Osgood Drive. BT Energy provided the design, engineering, and procurement, and subcontracted onsite installation to Eco Tech Electrical. Works commenced in March 2021 with several delays due to long lead times in procuring protection panels and RMU during the pandemic. Installation and commissioning were completed in December 2022. The project was completed simultaneously with the Wyuna Cold Stores project.