SCOPE OF PROJECT
Design, supply and installation of rooftop 37.74kw solar system. Scope included 2 site visits for planning and design to site and conditions. Remote location of works required careful planning of logistics including container
loading and barge transportation of materials and supplies. Installation completed in 1 week onsite.